Hello again all,
I made an error in my math for the extended life support power requirement. I used the power modifier of 0.001 instead of 0.002 as indicated on my post time stamped: August 13, 2019 at 7:59 AM
In my first post the incorrect entries I made are:
1. "Extended Life Support Power = 0.001 x 759,375 = 759.375 MW the listed power is 1,344.16."
The corrected entry is:
"Extended Life Support Power = 0.002 x 759,375 = 1,518.75 MW the listed power is 1,344.16."
2. "Taking the listed extended life support power of 1,344.16 I determined the modified hull volume as 1,344,160 and the the fuel tankage volume as being 1,012,500 - 1,344,160 = -331,660 kl."
The corrected entry using the correct power modifier of 0.002 is:
"Taking the listed extended life support power of 1,344.16/0.002 I determined the modified hull volume as 672,080 kl and the the fuel tankage volume as being 1,012,500 - 672,080 = 340,420 kl."
3."The value of 340,420 kl matches the power plant fuel tankage calculated if the Fuel and Miscellaneous section. Unfortunately, the extended life support power requirement does not match."
The corrected entry is:
"Both the basic and extended life support systems are using the fuel tankage of 340,420 kl which is the fuel tankage value determined for the power plant in the Fuel and miscellaneous section."
Tom Rux