I’m not sure if this is a general Voyager problem/glitch or an issue with serials check-in, so I apologize for the cross-posting and potential duplication.
We are using Voyager 7.2.5.
We cannot change the status of an old Continuation PO (with line items from FY2003 and FY2005) from “Received Partial” to “Complete” status. There are 2 line items in the PO and both statuses are reading “Received Complete.” There are 3 attached invoices that we changed from “Approved” to “Complete” status. The PO, however, still reads “Received Partial,” even after saving/closing. We tried to edit the Detailed Line Item “Receive/Mark” status, but the tab is gray so we do not have access.
Any assistance or insight is greatly appreciated.
Thanks!
Anor
&
Alia-Anor Akaeze
Acquisitions Coordinator
=====================
University of Massachusetts Boston
Joseph P. Healey Library
100 Morrissey Boulevard (HL-04-029)
Boston, MA 02125-3300
Email: library.acquisitions@umb.edu
Phone: 617-287-5947
FAX: 617-287-5955
Web: www.lib.umb.edu
P
Please consider the environment and
don’t print this email unless you really need to.